Tuesday, August 18, 2009

Next work day this Saturday August 22!!

Hello All!!
Ok last saturday some of us turned out and discussed some matters. 
Kent, Diane, Susan, Lynn and Andy .


#1 not to finish the french drain until the plumber is done with the back flow valve ect. 
#2 Kent and Andy are fabricating a steel sign out of old rail road nails spelling out
 "TIERRA ANITA" and it is going to be fabulas...connecting an arch way over the tiled pillars @ the entry way of the garden. That combined with some solar LEDs would be very welcoming in the evening when folks come to compost. Susan is doing the math for the archway for the rebarb.
#3 decided to make the next work day Saturday the 22 @7 am.

I spoke with Gail and she and Billy may get some more Horse Manure as is Susan and Andy. We still need to sheet mulch the back beds in the North and the surrounding beds on the perimeter. Diane would like to plant wild flowers along the sidewalk areas.

I think there will be plenty to do Sat am with the beds still needing attention.

Hope to see you there!!!
Lynn

No comments:

Post a Comment